Design Engineering

Coca-Cola saves 75% energy cost with SEW-Eurodrive

December 10, 2010   Staff

BRAMALEA, ON – Energy saving and CO2 reduction are the objectives of the modernized line at a major Coca-Cola bottling plant in Vienna.


Print this page

Related Stories

Leave a Reply

Your email address will not be published. Required fields are marked *

*